2020

Picture1.jpg

Master Energy Plan: EffectivEnergy Solutions identified a maximum potential reduction of 88% and implemented protocols to achieve 57% energy reduction - before the introduction of extensive PV sustainable energy.

New Brunswick results.png
PV New brunswick.jpg
  • First-Cost Investment: $16.4 million

  • Annual Energy Savings: $1.42 million

  • Avoided Maintenance Savings: $270K

  • Financing Principal and Interest: -$1.58 million

  • Annual Cash Flow (Positive): $110K 

  1. ECM 1 |  Lighting  - Upgraded All to Light Emitting Diodes (LEDs)

  2. ECM 2 | VFDs - Add Variable Speed Drives to All Chillers, Pumps & Fans

  3. 3.ECM 3 | IAQ Method - Reduce Ventilation Requirements with Air Cleaning

  4. ECM 4 | Central Chilled Water Plant - Removed 1,600 tons of Air-Cooled Equipment and Installed 800 Tons of Water Cooled, Variable Speed Chillers

  5. ECM 5 | Harmonic Mitigating Transformers – Replace most electrical transformers with harmonic mitigating technology