top of page
ECM CASE STUDY: AFTER & SAVINGS - 220,000sf (Completed 2020)


EffectivEnergy Solutions completed this project recently in which they identified a maximum potential energy reduction of 88% and implemented protocols to achieve 58% energy reduction - before the introduction of sustainable energy such as PV.
ENERGY REDUCTION PLAN
• Upgrade All Lighting to LEDs
• Eliminate Steam System to Prepare for Geothermal
• Distributed IT Cooling
• Install Variable Speed Drives
• EffectivEnergy Indoor Air Quality Method
• Update Energy Management System Programming
• Hot Water Heat Recovery
• Add Harmonic Mitigating Transformers
RENEWABLE ALTERNATIVES
• Geothermal Heat Pump System
• On-Site Photovoltaic Array
bottom of page